$169.00 is based on (FirstRate5):
$169.00 Inc GST (per Assessment) is based on a new single storey house/dwelling using standard basic construction methods up to 200 sqm with no split levels and/or multi wall, floor and roof constructions.
Split levels and/or multi wall, floor and roof constructions will incur extra fees due to the extra work involved in performing the assessment.
* A price will be issued via email if the project is outside these parameters once we have been supplied with the Working Drawings.
** Artificial Lighting Reports are not part of an energy rating report/process, if required then separate pricing applies.
*** Each assessment requires an individual Certificate which is submitted to the RBS/Council with your stamped Working Drawings.
Cost details as per our Price Guide Web page.
(Excludes Town Planning Assessments)
We require the following (FirstRate5):
The Detailed Working Drawings should show the following details: | |
• | Site Plan with a north point also showing bearings/degrees. |
• | Floor Plans showing; window sizes or numbered to a Window Schedule, door sizes, floor coverings and fully dimensioned. |
• | Labelled Elevations showing; windows including materials, types & openability; roof materials including styles & colours; plus external cladding including types & colours. |
• | Sections must show construction material, systems & sizes; plus location of insulation. |
• | Lighting/Electrical plans (If available). |
• | Window and Door Schedules must show material types, sizes and openability styles (If available). |